Is there anything missing from the proposed guidelines?

<p></p><p>The proposed guidelines will require an owner or operator to submit a  Construction Management Plan  to the municipality as part of the development application review and approval process, and will include the following minimum criteria: </p><p>Project description;Project contact information (Owner and/or Responsible Contractor); Construction schedule; Hours of operation; Site plan; Traffic Control Plan(s) (TCP); Haul routes and staging areas; Pedestrian Management Plan(s) (PMP); Site protection (hoarding) details and aesthetics, if applicable; Signage details; Safety protocols; Overhead crane lifting operation details and locations; Stormwater management plan; Description of noise, dust, and emissions controls. Is there anything missing?  </p><br>